Stageline SL250 / SL255

Stage Configuration

Maximum Clearance
Installation Time
Load Bearing Capacity
Lifting Capacity
Personnel Recommended

32' x 24' (SL250)
32' x 32' (SL255)
18' - 1"
1.5 Hours
17,500 lb
8,000 lb
1 certified operator/
1 stagehand

Eliminate the need for motors and trusses on the permanent 2'' (50 mm) pipe grid to allow for more stage clearance. Rig at deck level and raise the roof with 8,000 lb (3,630 kg) of sound, lights and banners using the double-mast system.Benefit from a total roof rigging capacity of 17,500 lb (7,938 kg).