|
Stage Configuration
Maximum Clearance Installation Time Load Bearing Capacity Lifting Capacity Personnel Recommended
|
32' x 24' (SL250) 32' x 32' (SL255) 18' - 1" 1.5 Hours 17,500 lb 8,000 lb 1 certified operator/ 1 stagehand
|
  |
Eliminate the need for motors and trusses on the permanent 2'' (50 mm) pipe grid to allow for more stage clearance. Rig at deck level and raise the roof with 8,000 lb (3,630 kg) of sound, lights and banners using the double-mast system.Benefit from a total roof rigging capacity of 17,500 lb (7,938 kg).
|